Skip to content

Use case · Pilot design

Design the pilot
both sides can judge

A pilot nobody can fail is a pilot nobody can pass. AnyCRM proposes the channel from the evidence, writes exit criteria as lines both sides sign, and finds the missing baseline before week one rather than at week twelve.

  • Channel and scope from the evidence
  • Exit criteria both sides sign
  • The baseline found before week one

Deal economics

Sample data

Open

AnyCRM. Deal economics.

Proposed

The pilot, proposed from the report, channel, scope and length. Channel: inbound chat on billing queries, The theme their own customers raise most. Scope: two intents, one language, Small enough to run, large enough to read. Length: twelve weeks, two review points, Week four and week eight

Exit criteria

What both sides agree counts as passing, written before it starts. Containment against the agreed line, measured weekly. Resolution quality, sampled and scored, human review. Escalation handover time, against their own current handling Shapes, not promises. Each line is the level the pilot has to reach, agreed by both sides in writing.

Risk

There is no baseline for the channel you chose. Billing chat is handled by a team that does not report separately, so week twelve would end in an argument about whether anything improved. No baseline.

Your call

Three moves offered: Add two baseline weeks before the pilot starts; Run on email, where they already report separately; Run in shadow for a fortnight and use that as the line. The plan rewrites itself around the choice.

Resolved

Two measurement weeks added at the front, Their team keeps working, the numbers get captured. Exit criteria re-expressed against that baseline, Every line now has something to be compared to. Week fourteen ends in a decision, not a debate. Baseline agreed. Exit criteria signed by both sides.

Deliverables

Pilot design, Channel, scope, length, review points and owners. Exit criteria sheet, Each line, how it is measured, who reads it. Review points, Week four and week eight, on both calendars. Filed on Larkspur Utilities, activity logged, both review points on the calendar.

Close

Design the pilot so it can be failed.

A pilot designed so both sides know what passing looks like. A coded simulation. Not connected to a live account.

Larkspur Utilities, whose billing chat queue turned out to have nothing to measure against.

How it works

Four steps, and none of them is typing.

  1. 1

    Their customers pick the channel.

    Larkspur Utilities

    Sample
    • Channel: inbound chat on billing queries

      The theme their own customers raise most

      From the report
    • Scope: two intents, one language

      Small enough to run, large enough to read

    • Length: twelve weeks, two review points

      Week four and week eight

    The queue their own customers raise most is the one the pilot runs on, taken from the report already on the account.

  2. 2

    Scope small enough to read.

    Larkspur Utilities

    Sample
    • Containment against the agreed line

      measured weekly

    • Resolution quality, sampled and scored

      human review

    • Escalation handover time

      against their own current handling

    Shapes, not promises. Each line is the level the pilot has to reach, agreed by both sides in writing.

    A defined set of intents, one language, a fixed length and two review points. Everything outside that is written down as outside it.

  3. 3

    No baseline, no start.

    Larkspur Utilities

    Sample

    There is no baseline for the channel you chose.

    No baseline

    When the chosen queue is not reported separately on the client side, week twelve would end in an argument. The flag offers baseline weeks at the front, a different channel that is already measured, or a shadow period used as the line.

  4. 4

    Both sides sign what passing means.

    Documents

    Sample
    • Pilot design

      Channel, scope, length, review points and owners

    • Exit criteria sheet

      Each line, how it is measured, who reads it

    Sent for signature

    The exit criteria sheet says what is measured, how, by whom, and what level counts as a pass, with the review dates on both calendars before anything is switched on.

The risk beat

When something turns, it tells you and shows you the moves.

Here the turn is: There is no baseline for the channel you chose. Three moves were offered and a person took one: add two baseline weeks before the pilot starts.

Risk beat · AnyCRM AI

Sample data
  1. 1

    Detection

    There is no baseline for the channel you chose.

  2. 2

    Explanation

    Billing chat is handled by a team that does not report separately, so week twelve would end in an argument about whether anything improved.

    No baselineRaised before the pilot is proposed
  3. 3

    Options

    • Add two baseline weeks before the pilot starts
    • Run on email, where they already report separately
    • Run in shadow for a fortnight and use that as the line
  4. 4

    Human choice

    Add two baseline weeks before the pilot starts

    A person presses one. Nothing is sent or written until then.

  5. 5

    Resolution

    Week fourteen ends in a decision, not a debate.

    Both sides signed the same definition of passing before anything was switched on, and the baseline behind it was measured rather than remembered.

    Baseline agreedExit criteria signed by both sides

Where the answers come from

The record you already have.

A pilot is designed from what the account already tells you: which queue their customers complain about, what your delivery model covers, and what can actually be measured on their side.

The voice-of-customer read

Which queue their customers actually complain about

Your service lines

What your delivery model can stand behind for twelve weeks

The deal record

What has already been proposed and agreed

The output

The pilot design

Every line points back at one of these.

The client's reporting

Whether the chosen channel can be measured at all

Meeting transcripts

Constraints and dates the client has already named

Past pilots

What scope has actually been readable before

What you receive

Documents, not a dashboard.

A pilot design and an exit criteria sheet both sides can sign, with the review dates already on two calendars.

See the full CS Teams page
  • Tasks

    The pilot design

    Channel, scope, length, review points and owners

  • XLSX

    Exit criteria sheet

    Each measure, how it is read, and who reads it

  • Baseline plan

    PDF

    Baseline plan

    How the line is established before the pilot starts

  • Tasks

    Calendar review points

    On both sides, before anything is switched on

Why BPOs need this

What we heard, in their words.

  • The problem

    Week twelve is an argument about whether anything improved.

    A delivery lead

  • The problem

    The client's definition of success appeared in month three.

    A sales director

  • The problem

    We piloted on a queue nobody reported on separately.

    An operations manager

Questions

The honest answers.

Who decides the exit criteria?

Both sides. The sheet is drafted from the evidence and signed before the pilot starts, which is the only point at which the definition is uncontested.

What if there is no baseline?

The design stops and says so, and offers three ways through: measure first, move to a channel that is already measured, or run in shadow and use that as the line.

Does the pilot design include pricing?

Pricing sits on Deal economics, where the price per outcome is built. The pilot design covers what is run, how long for, and what counts as passing.

Can the scope change mid-pilot?

It can, as a recorded change with a reason. What it cannot do is change quietly, because every weekly report reads against the criteria as signed.

Where the pilot meets the commercial shape: scenarios, the pricing inputs behind an outcome price, and the margin guardrails a pilot has to respect to be worth running.

Deal economics

Give your team the unfair advantage.

Full deal intelligence from day one. No credit card required.

Get started free

AnyCRM, end to end