Use case · Pilot management

Run the twelve-week pilot
on one board both sides read

The pilot runs from the design both sides signed. Every week the same measures read against the same lines, and a blocker gets a name the week it appears rather than an explanation at the end.

  • Kickoff from the signed design
  • The same measures every week
  • Blockers owned when they appear

Delivery

Sample data

Open

AnyCRM. Delivery.

Kickoff

Marisol Bank, week 1 of 12. The kickoff pack builds from the SOW: scope, outcome definitions, attribution, roster, escalation path. Done.

Weeks 1 to 5

Weekly check-ins, the blockers log and the decisions log fill in. Containment on plan, staffing on plan, no blockers.

Week 6

Containment: behind plan, week 6 target missed. Blockers: 2 open, 1 critical, 1 medium. The week 6 check-in is a draft. Blocker: billing intent transfers to human at three times the plan.

Plan vs actual

The plan curve rises from week 1 to week 12. The actual curve tracks it, then falls below and stops at week 6.

Risk

Containment is behind the week 6 plan. Two intents account for most of it: billing disputes and address changes. Both transfer to a human early. The client check-in is Thursday.

Your call

Retrain the two intents and re-test before Thursday. Extend human coverage on the peak hour for two weeks. Reset the week 8 target with the client, with the evidence attached. The first is pressed.

Resolved

Task assigned to the delivery lead, the check-in draft rewritten, the client view updated. The containment tile turns green and the actual curve bends back toward plan.

Send

The check-in is shared with Marisol Bank and the activity is logged.

Close

A pilot nobody has to reconstruct at the end.

Twelve weeks of pilot, visible to both sides, week by week. A coded simulation. Not connected to a live account.

Marisol Bank, three weeks into a twelve-week pilot, where a routing rule on their side was quietly starving it.

How it works

Four steps, and none of them is typing.

  1. 1

    Kickoff from the SOW.

    Pilot · Week 1 of 12

    Sample
    • Kickoff pack

      Scope, outcome definitions, attribution, roster, escalation path

      Done

    Built from the signed SOW and issued to both teams in week one.

    Scope, outcome definitions, attribution, the roster and the escalation path come out of the signed paper as a kickoff pack, issued to both teams in week one. Nothing is retyped.

  2. 2

    Weekly, on its own.

    Pilot · Week 6 of 12

    Sample

    Containment

    Behind plan

    Week 6 target missed

    Blockers

    2 open

    1 critical, 1 medium

    Every week the same measures read against the lines both sides agreed, the check-in drafts itself, and blockers and decisions go into one log the client can open.

  3. 3

    Behind the line, it shows the moves.

    Pilot · Week 6 of 12

    Sample

    Containment is behind the week 6 plan. Two intents account for most of it.

    Behind the line

    Week six lands behind plan and the board names the two intents behind it before the client check-in. Retrain and re-test, extend human coverage on the peak hour, or reset the week eight target with the evidence attached. A person picks.

  4. 4

    Two views, one truth.

    Pilot · Week 6 of 12

    Sample
    • Week 6 check-in, rewritten

      Two intents retrained, re-test passed

    • Task on the delivery lead

      Due Wednesday

    Shared with Marisol Bank

    The BPO view and the client view read the same numbers. The fix, the task and the rewritten check-in appear on both, and the twelve-week decision opens twelve weeks of record.

The risk beat

When something turns, it tells you and shows you the moves.

Here the turn is: Containment is behind the week 6 plan. Three moves were offered and a person took one: retrain the two intents and re-test before thursday.

Risk beat · AnyCRM AI

Sample data
  1. 1

    Detection

    Containment is behind the week 6 plan.

  2. 2

    Explanation

    Two intents account for most of it: billing disputes and address changes. Both transfer to a human early. The client check-in is Thursday.

    Behind the lineTwo intents named
  3. 3

    Options

    • Retrain the two intents and re-test before Thursday
    • Extend human coverage on the peak hour for two weeks
    • Reset the week 8 target with the client, with the evidence attached
  4. 4

    Human choice

    Retrain the two intents and re-test before Thursday

    A person presses one. Nothing is sent or written until then.

  5. 5

    Resolution

    Back toward plan before Thursday.

    Task assigned to the delivery lead, the check-in draft rewritten, the client view updated, and the actual curve bending back toward plan.

    Re-test passedBoth views updated

Where the answers come from

The record you already have.

A pilot that is measured weekly against criteria both sides signed does not need reconstructing at the end. Everything the week-twelve decision needs is captured as it happens.

The signed pilot design

Scope, criteria, owners and the review dates

The agreed baseline

What each measure is compared against

Weekly measurement

The same shapes, in the same order, every week

The output

The kickoff pack

Every line points back at one of these.

The blocker log

What is in the way, who owns it, since when

Check-in transcripts

Decisions made in the weekly, captured as they are made

The account record

The signed SOW, the contacts and the pilot design behind the board

What you receive

Documents, not a dashboard.

A weekly report both sides read, a blocker log with owners, and a shared view the client can open without asking anyone.

See the full CS Teams page
  • The kickoff pack

    PDF

    The kickoff pack

    Issued to both teams in week one

  • Weekly pilot report

    PDF

    Weekly pilot report

    Each measure against its line, with blockers

  • XLSX

    The blocker log

    Owner and date on each, both sides

  • Read-only. Revoke any time.
    Link

    A shared pilot view

    Read-only, open to the client whenever they want it

Why BPOs need this

What we heard, in their words.

  • The problem

    We rebuild the pilot story from emails in week eleven.

    A delivery lead

  • The problem

    The client thought it was going badly and nobody knew why.

    A customer success lead

  • The problem

    A routing change on their side took three weeks to surface.

    An operations manager

Questions

The honest answers.

Who sees the weekly report?

Both teams. The same measures against the same lines, plus a shared read-only view the client can open without asking for an update.

What happens when a measure is behind?

It is raised that week with the cause traced, and the moves are offered. Correcting in week three is a conversation; correcting in week eleven is a failure.

Can the pilot change shape mid-flight?

Yes, as a recorded change agreed in the weekly. The reports keep reading against the criteria as signed, so the change is visible rather than absorbed.

Does it change anything in the client's system?

No. Anything on their side, including routing, is a request their team agrees to and a logged decision.